
2,200 SF in Elkhorn WI, complete 2019
Small sunroom addition, Whitefish Bay
Second story addition and extensive remodeling / reconfiguration in Big Bend WI. 2019

Extensive remodeling and large addition in Lake Geneva WI. Completed 2007
Entire second floor added onto 1300 SF ranch plus reconfiguration of first floor. Brown Deer WI 2020

Entire second floor added onto 800 SF ranch in St. Francis, complete spring 2022
Extensive multi level addition and remodeling, Franklin WI
New construction near Wolfeboro, NH. Complete in 2012 under Beckwith Builders
Balcony, deck and lower level patio , 2020

Extensive remodeling and large addition in Lake Geneva WI. Completed 2007

Timber framed luxury lake house in New Hampshire, drawings complete while working with Beckwith Builders under Architect. Completed 2012.

Extensive remodeling including bearing wall removal. Completed 2022

Large two-story addition complete in 2021 in Caledonia, WI

Full kitchen, bath and mud room remodeling. Included removal of bearing wall and new posts and beam. 2020 complete

Completed summer 2020 - Shorewood, WI (Milwaukee) Creation of walk out basement with hot tub and patio, multiple brick bearing wall removal and full refinishing

Addition doubling the size of original house. Project designed and drawn for former high school science teacher. Built in 2008

New Construction Cedarburg WI. Showing 95% complete Aug. 2022

Completed summer 2020 - Sturtevent WI. Light manufacturing facility. Involved extensive interior remodeling including conversion of storage mezzanine to additional office space

Was project manager for two fire stations from start to finish in Casper WY from 2013-2015

Extensive addition and remodeling. Design and Drawing under Kehoe Henry & Associates, circa 2007

5 ~50 unit apartment buildings plus a clubhouse. Was project architect through design and construction drawings with SPS Architects, circa 2018

Two sites each with a new walk in cooler and walk in freezer. Involved interior remodeling such as door infills, new partitions, new finishings all around

Addition and Remodeling under Balestrieri Kehoe & Associates circa 2005

Project Architect from design start through construction drawings. Working under SPS Architects. Mequon, WI 2018

New 'work-live' building on Lauderdale Lakes. Built est. 2007. Worked under Kehoe Henry Architects

Extensive remodeling and large enough addition to be considered new construction. Built in summer 2014

Two sites each with a new walk in cooler and walk in freezer. Involved interior remodeling such as door infills, new partitions, new finishings all around

Included 11 - 7 unit walk up apartment style unit buildings in Oconomowoc WI working under SPS Architects

10 3 level walk up condo units near the lake in Port Washington WI, complete 2021. Worked under SPS Architects as Project Architect