Trenkle Architecture

Trenkle ArchitectureTrenkle ArchitectureTrenkle Architecture

Trenkle Architecture

Trenkle ArchitectureTrenkle ArchitectureTrenkle Architecture
  • Home
  • Services
  • Contact
  • About Us
  • Built
  • Unbuilt
  • Art
  • Reviews
  • More
    • Home
    • Services
    • Contact
    • About Us
    • Built
    • Unbuilt
    • Art
    • Reviews
  • Home
  • Services
  • Contact
  • About Us
  • Built
  • Unbuilt
  • Art
  • Reviews

Completed Projects - Residential

Krause Residence - New Construction

Shields Residence - Addition & Remodeling

Krause Residence - New Construction

2,200 SF in Elkhorn WI, complete 2019

Arens Residence - Addition

Shields Residence - Addition & Remodeling

Krause Residence - New Construction

Small sunroom addition, Whitefish Bay

Shields Residence - Addition & Remodeling

Shields Residence - Addition & Remodeling

Second story addition and extensive remodeling / reconfiguration in Big Bend WI. 2019

Romanowski Residence Addition and Remodeling

Extensive remodeling and large addition in Lake Geneva WI. Completed 2007

Garcia Residence

Entire second floor added onto 1300 SF ranch plus reconfiguration of first floor. Brown Deer WI 2020

Pennsylvania Ave 2nd story Addition

Entire second floor added onto 800 SF ranch in St. Francis, complete spring 2022

Spiegel Residence

Extensive multi level addition and remodeling, Franklin WI

New Hampshire Lake House

New construction near Wolfeboro, NH. Complete in 2012 under Beckwith Builders 

Bose Residence

Bose Residence

Balcony, deck and lower level patio , 2020

Romanowski Residence

Romanowski Residence

Extensive remodeling and large addition in Lake Geneva WI. Completed 2007

Jones Residence

Romanowski Residence

Timber framed luxury lake house in New Hampshire, drawings complete while working with Beckwith Builders under Architect. Completed 2012.

Pewaukee Kitchen Remodeling

Pewaukee Kitchen Remodeling

Extensive remodeling including bearing wall removal. Completed 2022

Martinez Residence

Extensive Basement finishing and excavation

Pewaukee Kitchen Remodeling

Large two-story addition complete in 2021 in Caledonia, WI

Kitchen Remodeling - Mequon

Extensive Basement finishing and excavation

Extensive Basement finishing and excavation

Full kitchen, bath and mud room remodeling. Included removal of bearing wall and new posts and beam. 2020 complete

Extensive Basement finishing and excavation

Extensive Basement finishing and excavation

Extensive Basement finishing and excavation

Completed summer 2020 - Shorewood, WI (Milwaukee) Creation of walk out basement with hot tub and patio, multiple brick bearing wall removal and full refinishing

Poggensee Residence

Poggensee Residence

Poggensee Residence

Addition doubling the size of original house. Project designed and drawn for former high school science teacher. Built in 2008

Hayry Residence

Poggensee Residence

Poggensee Residence

New Construction Cedarburg WI. Showing 95% complete Aug. 2022

Commercial

Office entry addition and interior remodeling

Completed summer 2020 - Sturtevent WI. Light manufacturing facility. Involved extensive interior remodeling including conversion of storage mezzanine to additional office space

Casper Fire Station

Was project manager for two fire stations from start to finish in Casper WY from 2013-2015

Badger High School - Lake Geneva

Badger High School - Lake Geneva

Extensive addition and remodeling. Design and Drawing under Kehoe Henry & Associates, circa 2007

Watermark at the Grove

Milwaukee Public Schools Walk in Coolers and Freezers

Badger High School - Lake Geneva

5 ~50 unit apartment buildings plus a clubhouse. Was project architect through design and construction drawings with SPS Architects, circa 2018

Milwaukee Public Schools Walk in Coolers and Freezers

Milwaukee Public Schools Walk in Coolers and Freezers

Milwaukee Public Schools Walk in Coolers and Freezers

Two sites  each with a new walk in cooler and walk in freezer. Involved interior remodeling such as door infills, new partitions, new finishings all around

Elkhorn Middle School

Milwaukee Public Schools Walk in Coolers and Freezers

Milwaukee Public Schools Walk in Coolers and Freezers

Addition and Remodeling under Balestrieri Kehoe & Associates circa 2005

More Commercial

FoxTown Brewery and Restaurant

Midwest Teen Center - New Commercial Construction - Recreation

FoxTown Brewery and Restaurant

Project Architect from design start through construction drawings. Working under SPS Architects. Mequon, WI 2018

Lauderdale Lake House

Midwest Teen Center - New Commercial Construction - Recreation

FoxTown Brewery and Restaurant

New 'work-live' building on Lauderdale Lakes. Built est. 2007. Worked under Kehoe Henry Architects

Midwest Teen Center - New Commercial Construction - Recreation

Midwest Teen Center - New Commercial Construction - Recreation

Midwest Teen Center - New Commercial Construction - Recreation

Extensive remodeling and large enough addition to be considered new construction. Built in summer 2014

Milwaukee Public Schools Walk in Coolers and Freezers

Milwaukee Public Schools Walk in Coolers and Freezers

Midwest Teen Center - New Commercial Construction - Recreation

Two sites  each with a new walk in cooler and walk in freezer. Involved interior remodeling such as door infills, new partitions, new finishings all around

Preserve at Prairie Creek

Milwaukee Public Schools Walk in Coolers and Freezers

Lakepointe Townhome Condos

Included 11 -  7 unit walk up apartment style unit buildings in Oconomowoc WI working under SPS Architects

Lakepointe Townhome Condos

Milwaukee Public Schools Walk in Coolers and Freezers

Lakepointe Townhome Condos

10 3 level walk up condo units near the lake in Port Washington WI, complete 2021.  Worked under SPS Architects as Project Architect 

Our site is under construction and more projects will be pos

Find out more

Copyright © 2025 Trenkle Architecture - All Rights Reserved.

Powered by